LONGITUDINAL SECTION
PLAN
| Per Round | Per Cubic Yard | Per linear Foot of Tunnel | |||||||
| Total Depth Drilled | No. of Cubic Yards | Pounds of Dynamite | Adv. | Linear Feet Drilled | Pounds of Dynamite | Cu. Yd. | Linear Feet Drilled | Pounds of Dynamite | |
| Heading | 190-220 | 35-42 | 134-196 | 6½-8 | 5.4-6.0 | 3.9-5.0 | 5.3 | 28 to 32. | 20.7-26.5 |
| Bench | 110-130 | 55 | 79-106 | 4 | 2.-2.4 | 1.4-2.0 | 13.7 | 27.-33. | 19.2-27.4 |
| Total | 19 | 55.-65. | 39.9-53.9 | ||||||
| Per cubic yard, whole tunnel section | 2.9-3.4 | 2.1-2.8 | |||||||
| Blasting Notes: | Number of Sticks | |
| Heading: | First Round; 2 to 3 relieving holes sprung with 4 to 5 stickseach | 8 to 15 |
8 cut holes, 7 sticks each (sometimes shot twice) | 56 to 112 | |
First side round, 6 holes, 6 sticks each | 36 | |
Widening and dry holes, 10 to 12, 6 sticks each | 60 to 72 | |
| Total Sticks | 160 to 235 | |
| Total Pounds | 134 to 196 | |
Sub‑bench: | 8 holes, 4 to 6 sticks, each | 32 to 48 |
| Bench: | 8 holes, 6 to 8 sticks, each | 46 to 64 |
| Taking up bottom, average | 15 | |
| Total Sticks | 95 to 127 | |
| Total Pounds | 79 to 109 | |
CROSS-SECTION