Fig. 113.—Isometrical Perspective Balloon Frame.
Very small buildings, if unplastered, will not require ceiling joists; a tie at each end will be all-sufficient. Moderate size buildings will be strong enough if the ceiling joists are left out, and collars put on half way up the rise of the rafter. According to the size and uses of the building, the collars or ceiling joists may be put on every rafter, every other, or every third rafter; floor joists should be about 16 inches between centres, and the studding may be from 16 inches to 8 feet apart; in the last case only, every sixth floor joist is nailed to the stud, the intermediate ones being arranged equally distant from each other between the studding. Where the studding is placed wide apart, the plate must necessarily be heavier to sustain the roof; if vertical siding be used, it should be nailed to the sill and plate, and to an intermediate horizontal strip spiked in between the studding; if done in this way, the plate may be lighter; when horizontal siding is used, the studding should not be more than 4 feet apart—in small buildings, say 12 by 20 feet, we should cut all our stuff, except joists, from 1¼ inch plank. Studs 4 inches wide, rafters 5 inches wide; floor joists should be 2 by 9 inches, and put all up 30 inches between centres.
In [Fig. 114] is shown the manner of constructing frames for buildings of three stories. The corner stud, 4 by 4, is composed of and built up with two 2 by 4 studs, which are nailed together, breaking joints as the building progresses in height; the splicing of studs is done in the same manner, being nailed together as fast as additional length is required; the joists of the last floor are laid upon the plate, and they act as tie-beams to sustain the thrust of the rafters. We consider the splice where the studs butt and have side strips nailed to them, to be the most secure; the lapping splice is very generally used, however, and found to answer every purpose.
Ribs for vertical siding may be put on in two ways; one as shown, by which the ribs run over the sill, and are nailed to it; a strip of the same thickness as ribs, say 1¼ inches, nailed on to the sill to fill up the space between the ribs, and is then covered by the outside plinth or base. The other plan is to set the studs back 1¼ inches from face edge of sill; then let the end of ribs bevel down on the sill, or dovetail them into the edge.
Fig. 114, Fig. 115, Fig. 116, Fig. 117, Fig. 118.
Either outside or inside lining may be used, or both together. Where diagonal lining is used, it should be reversed or run the other way on the opposite side of the house.