All masonry in cement or lime will be finished with a good pointing of cement, without extra charge.

BRICKWORK.

When bricks are required, or allowed to be used, they shall consist of sound, hard-burned brick, laid in cement, or common mortar, as directed, and no soft or salmon brick will be admitted; and none but regular bricklayers must be employed.

CENTERING AND BACKING.

The whole top of all arches, whether brick or stone, shall be finished by plastering with a good coat of cement, so as to prevent the percolation of water, and turn it away from the arch. The centering shall be such as the engineer approves of in every respect, and shall not be removed until he directs. The cost of backing to be included in the price bid. For arches of more than twenty-five feet span, compensation shall be made, at the engineer’s estimate, for the extra value and cost of the centering proper for large arches.

GENERAL PROVISION.

79. The engineer reserves the right to require the whole or any part of the above described work of masonry to be laid in cement, lime, mortar, or dry, at his discretion. First and second class masonry, and brickwork, will be bid for at prices for laying in cement, from which will be deducted fifty cents per yard if laid in lime mortar, and one dollar if laid dry. Third and fourth class masonry at prices for laying dry, to which will be added fifty cents per yard if laid in lime mortar, and one dollar if laid in cement.

SCAFFOLDING.

80. Nothing shall be allowed for workmanship or timber of any scaffolding used in the construction of timber bridges, or in carrying up abutments, piers, coffer-dams, or otherwise. Should the timber used in any coffer-dam be carried away by floods, the renewal of it shall fall upon the first party.

FOUNDATIONS.