The other bridges are on the main line of the South Wales Railway, and are four in number, each for two lines of way.
One at Loughor is a wrought-iron swing bridge, of 30 feet opening, of the ordinary construction, with girders 90 feet in length, resting upon 36 rollers, which are secured in a ring concentric with the pivot. The opening and closing is effected by means of a crab, fixed clear of the bridge, near the centre. A chain passes from the overhanging end of the bridge to this crab, and taking one or two turns round the barrel, to ensure a sufficient amount of friction, is led to the tail end. The bridge can thus be opened or shut by turning the crab handle in opposite directions. The overhanging end, when across the river, is raised upwards to a small extent by weighted levers, and wedges are then drawn in under it to give it a solid bearing.
At Kidwelly and at Haverfordwest there are wrought-iron lifting bridges, the former of 20 feet, and the latter of 30 feet span. Each of these turns on a horizontal axle like the Bullo Pill bridge; but, instead of being lifted by levers overhead, it has a narrow, heavily-weighted tail end, beneath the planking of the viaduct, which is pulled down with a chain worked by a crab. The portion which carries each line of way is made to open independently. In this form of bridge no wedges or adjusting arrangements are required for the bearings of the overhanging end.
Over the river at Caermarthen is a skew bridge of three girders, each 116 feet long, for a double line of way. It occupies two spans and rolls back, so as to leave a 50-feet opening for the navigation. The swing bridge at Bristol, already described, was at first intended to be a rolling bridge, and to be furnished with wheels to run back on fixed rails, but the difficulty of forming a good foundation for the wheel path led to the design being altered. At Caermarthen the same difficulty was overcome by putting wheels turning in fixed bearings on the pier and abutment of the bridge. The undersides of the girders carry inverted rails, and run back on the wheels. The bridge, when shut, is on an incline of 1 in 50. When about to be opened it is made to assume a horizontal position by turning a supporting cam to lower the overhanging end, and the tail end then rises sufficiently to pass clear above the part of the railway over which it runs back.
By this arrangement the bridge, while in motion, moves along a level path. It is opened and closed by hydraulic machinery.
All these opening bridges have worked satisfactorily since they were constructed.
Trussed Bridges.
When the timber viaduct over the river Usk, at Newport, was burnt down,[98] Mr. Brunel decided to form the new superstructure of the centre opening with three iron trusses, for the two lines of way.
These are bow and string girders, of 100 feet span, and were made of considerable height, not only to reduce the strain on each of the members of the framework, but also in order that the rib or upper portion of each truss might be braced diagonally to the corresponding portion of the other trusses, and headway left for the locomotive chimneys to pass underneath. This bracing counteracts any tendency of the ribs to bend sideways under the compressive strain. The form of the trusses is shown in fig. 1, Pl. IV. (p. [206]). Each truss is a wrought-iron polygonal arch of triangular section, from which is suspended a horizontal girder supporting the roadway. This girder also forms the tie which connects the feet of the arch and counteracts its thrust. The diagonal braces shown on the elevation of the bridge prevent the arch from being distorted by the unequal loading caused by a passing train. The middle truss is twice the strength of each of those at the outside, being made so by increasing the thickness of the plates. One of the outside trusses was tested with a distributed load of 1½ tons per foot-run of its length.