FINISHING: Block each strip to measurements. Weave panels tog as follows: Weave panel No. 1 to panel No. 2; weave free edge of panel No. 2 to center panel; weave free edge of center panel to panel No. 2; weave free edge of panel No. 2 to panel No. 1.

EDGE: Attach yarn in any corner; working along short side, * ch 1, skip 1 st, sl st in next st, repeat from * to next corner; working along long side, * ch 1, skip 1 row, sl st in next row, repeat from * to next corner; complete remaining sides in same manner, join. 2nd ROUND: * Ch 1, sl st in same space, repeat from * twice, * ch 1, working in back loop of sts, sl st in next ch 1, repeat from last * to next corner, repeat from beg all around, join, cut yarn.

KNITTING ABBREVIATIONS

KKnit
PPurl
St(s)Stitch(es)
YOYarn Over
Dec.Decrease
Inc.Increase
Tog.Together
Rnd.Round
P.s.s.o.Pass slip st over st
dpnDouble pointed needle
K-ODo not work st, row or round
Beg.Beginning
Bet.Between

Pillow 1

Aran Pillow #1

Approximate size: 18 x 18 inches

Materials Required: